Hidden Canyon Industrial Park
EIR Addendum and Specific Plan | Beaumont, California

The Hidden Canyon Industrial Park Specific Plan provides for development of up to 2.89 million square feet of distribution warehouse uses on an approximately 196.54-acre site located in the westerly portion of the City of Beaumont. Objectives of the Project include:
- Transition the existing site into a productive use;
- Capitalize on available and planned access to major and secondary roads within the City, with direct connection to the regional freeway system;
- Provide jobs-producing, light industrial uses to the City of Beaumont and local community; and
- Increase economic benefits to the City of Beaumont through increased job creation.
The Project also provides economic stimulus to the City and region in a manner consistent with the intent of the City of Beaumont 2009 Economic Stimulus Program.
Planning Strategies and Environmental Solutions
Applied Planning, Inc.
11762 De Palma Road, 1-C 310 | Corona, CA 92883 | 909.937.0333 | jgilbert@appliedplanning.com
Established in 1997